Black Grid Shower Screen - Lewes

This striking black grid shower screen combines modern industrial design with practical functionality. Created for a Lewes home, the full-height installation features ultra clear glass panels set within a sleek satin black frame with custom shelving and unique posts.

Black grid walk-in shower screen with full height design and microcement walls in Lewes

Industrial Style Meets Modern Design

The black grid shower screen creates a stunning focal point in this bathroom. With its full-height design reaching from floor to ceiling, the screen adds architectural interest while providing a practical shower space.

We designed this at 2000mm x 2400mm through our bespoke installations - the minimum width needed to contain water splashes in this spacious bathroom. The grid pattern adds visual interest and creates a distinctive industrial look that complements the bathroom's style.

Front view of bespoke black grid shower enclosure with double shower setup and patterned floor tiles

Spacious Double Shower Design

This walk-in shower features entry points on both sides, making it ideal for a double shower setup. The microcement walls provide a smooth, seamless backdrop that highlights the black frame's crisp lines and geometric pattern.

The patterned floor tiles add character to the space while contrasting beautifully with the simple, clean lines of the shower screen. We carefully positioned the frame to enhance the spacious feel of the bathroom while maintaining the elegant geometry of the design.

Close-up of the custom black shelf integrated within the framed shower screen design

Custom Shelf Integration

A standout feature of this installation is the bespoke shelf integrated into the frame design. This thoughtful addition provides practical storage for shower essentials while maintaining the clean, minimalist aesthetic.

The slim black shelf appears to float within the shower screen structure. We carefully engineered this feature to be both functional and visually pleasing, creating a perfect spot for shower items without disrupting the screen's elegant lines.

Detail view of the black grid shower screen showing flush front grid design and patterned floor tiles

Precision Engineering

Notice how the front grid sits perfectly flush with the perimeter frame. This careful attention to detail showcases our commitment to quality craftsmanship. The frame's precise corners and joints reflect our focus on excellence.

The shower screen features seamless integration with the patterned floor tiles. The careful placement ensures the screen appears to float elegantly above the floor while maintaining clean, uninterrupted lines throughout the installation.

Complete view of the walk-in black grid shower screen with satin black finish and ultra clear glass

Distinctive Design Elements

The shower screen includes distinctive posts that extend to the ceiling with an intentional gap above the main frame. This isn't just for ventilation – it's a deliberate design feature that adds visual interest.

We used ultra clear glass for maximum transparency, allowing the black grid pattern to stand out boldly against the light blue walls. The satin black finish provides a sophisticated matte look that resists fingerprints and water spots.

Product Specification

Style

Walk-in Shower Screen

Metal Finish

Satin Black

Glass Type

Ultra Clear Glass

Frame Style

Framed with Grid

Special Features

Bespoke Made Shelve, Posts, Full Height

Price Range

££££

Product Dimensions

Width

2000mm

Height

2400mm

Custom sizes available - contact us for bespoke measurements

How Long Does Black Grid Shower Screen Take to Manufacture?

Walk-in designs prioritize seamless integration with your bathroom layout. The Black Grid Shower Screen timeline varies based on wall preparation and structural requirements.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready. We'll take precise measurements and photos during our initial visit, then proceed with design and parallel production for faster delivery.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

21
Working Days Total
17
Production Days
1
Days On-Site

Timeline Considerations for This Project

  • The bespoke shelf requires ordering proper thickness material, preparation, and manufacturing with fixtures before the black finish can be applied.
  • Custom ceiling fixtures were required per the design and manufactured simultaneously with the shelf, extending production time.
  • Powder coating is applied in black after all parts are prepared to ensure edges are protected and covered, preventing chipping over time.

Tiling Not Ready

Extended Timeline

Your walls need tiling. We'll take initial measurements for visualization, start frame production early, then return for final measurements once tiling is complete.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 19) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 31 working days if tiling is ready when frames are done.

31
Working Days Minimum
12
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Design Your Black Shower Screen

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+