Black Shower Door with Fluted Glass - London

This striking black shower door showcases our expertise in creating bespoke shower doors. The elegant black frame houses high-quality fluted glass, creating a modern statement piece for this London bathroom.

Black shower door partially open showing slim threshold covering tile grout line

Custom Black Shower Door

This black shower door features our specially designed slim threshold that elegantly covers the tile grout line where the door meets the floor. The door's inward-opening design allows for maximum bathroom space use without compromising on the sleek look.

We carefully designed this door to match the bathroom style through our tailored service. All fixtures are concealed within the frame itself, contributing to the clean design that complements the contemporary bathroom aesthetic.

Black framed shower door closed with magnetic seals and clean lines

Carefully Crafted Frame

The closed black shower door shows our careful attention to detail, with perfectly aligned 30mm lines throughout the frame. We incorporated recessed magnetic blocks and high-quality black seals to ensure the door stays firmly closed and doesn't leak.

Our installation team positioned this shower enclosure to maintain even spacing around all edges. The satin black finish provides a matte appearance that resists fingerprints and water spots, making it both beautiful and practical.

Close-up view of fluted glass in the black shower door

Unique Fluted Glass

For this installation, we combined 4mm ultra-clear glass on the inside with 4mm reeded glass on the outside. Both panels are individually toughened before being laminated together, creating a unique textured appearance with exceptional strength.

The laminated construction ensures that if the glass breaks, it stays in place thanks to the interlayer between the panels. This safety feature provides peace of mind without compromising on the distinctive visual appeal of the fluted texture.

Bottom of the closed shower door showing perfectly aligned lines

Precise Alignment

The bottom of the closed shower door showcases our careful craftsmanship, with perfectly aligned lines throughout the structure. We designed a bespoke towel rail that is centered on the middle horizontal bar, with all fixtures hidden from view.

The black frame's clean lines complement the existing bathroom tiles and fixtures. Our shower screens are installed with care to ensure all components are level and properly sealed, creating a door that works well while enhancing the bathroom's look.

Side view of the black shower door partially recessed into shelf

Custom Integration

This angle shows how we partly recessed the shower frame into the left stone shelf, creating a clean integration. Following the client's request, we aligned the horizontal middle bar with the top of the shelf for visual flow.

The large shower door measures 800mm x 2500mm, while the entire enclosure spans 1800mm x 2500mm. Our team carefully set up the door's movement to ensure smooth operation despite its large size and weight. The towel rail allows users to place a towel within reach before showering.

Product Specification

Style

Inline Shower Enclosure

Metal Finish

Satin Black

Glass Type

9.2mm Reeded Laminated Toughened Glass

Frame Style

Framed

Special Features

Bespoke Towel Rail, Bespoke Shape and Finish, Toughened Lami with Flutes

Price Range

££££

Product Dimensions

Width

1800mm

Height

2500mm

Custom sizes available - contact us for bespoke measurements

What's the Full-height Fluted Door Production Timeline?

Fluted glass requires specialized processing and handling during production. Your Full-height Fluted Door timeline includes additional time for textured glass manufacturing.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready for fluted glass installation. We'll take precise measurements and begin the specialized textured glass production process.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

29
Working Days Total
25
Production Days
2
Days On-Site

Timeline Considerations for This Project

  • Adding a bespoke towel rail requires CNC machining time and extends frame production. If you prefer faster delivery, we can install the door without the integrated towel rail.
  • Reeded laminated glass requires additional processing to combine and toughen two glass panels, adding time compared to standard single-pane glass options.
  • The custom towel rail means we cannot use our stock black frames - both rail and frame must be anodised together to ensure perfect colour matching, which extends the timeline.

Tiling Not Ready

Extended Timeline

Your walls need tiling before fluted glass installation. We'll take rough measurements for design visualization, prepare for specialized glass production, then finalize measurements after tiling.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 24) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 41 working days if tiling is ready when frames are done.

41
Working Days Minimum
17
Production Days
2
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Fluted Glass Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+