This bespoke level access shower features a framed design with reeded glass panels in a bright gold anodised finish. The shower combines practicality with luxury through its seamless floor transition and custom metalwork that complements the natural stone tiling throughout the bathroom.
The shower's elegant brass frame houses vertical fluted glass that provides privacy while allowing light to filter through. The level floor creates a continuous flow between the bathroom and shower area, with identical natural stone tiling extending throughout the space.
For more elegant shower solutions like this, explore our level access shower enclosures collection.
The inward-opening door features an L-shaped handle on both sides and a custom towel rail on the outer face. A discreet 7mm brass threshold strip along the door line provides water containment without interrupting the level access design.
Our shower solutions can be tailored to any space requirements while maintaining accessibility and style.
Inline Shower Door
Anodised Bright Gold
Fluted Glass
Fully Framed
Customised towel rail, Bespoke Anodising
££££
Fluted glass requires specialized processing and handling during production. Your Level Access Shower Enclosure timeline includes additional time for textured glass manufacturing.
📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for fluted glass installation. We'll take precise measurements and begin the specialized textured glass production process.
✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.
Your walls need tiling before fluted glass installation. We'll take rough measurements for design visualization, prepare for specialized glass production, then finalize measurements after tiling.
💡 Flexible Timeline: The waiting period begins after frame production (day 24) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 41 working days if tiling is ready when frames are done.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.