Tinted Shower Enclosure - London

This corner tinted shower enclosure shows how grey glass creates privacy while looking modern and stylish. The dark tinted glass works like a one-way mirror - when the bathroom is brighter than the shower area, the glass reflects light and gives complete privacy while still letting some shaded light pass through.

Tinted shower enclosure in London bathroom with grey glass mirror effect and sloped ceiling

Grey Tinted Glass Privacy Solution

We installed this tinted shower enclosure in a London bathroom where privacy was important. The 10mm grey glass provides the perfect balance - you can't see through it, but shaded light still passes through to keep the shower area from being completely dark. The mirror effect happens naturally with grey glass when there's more light outside than inside the shower.

The frameless design with satin black wall brackets keeps the look clean and modern. We shaped the glass at the top to follow the sloped ceiling perfectly, creating custom solutions that use every bit of available height for comfortable showering.

Grey tinted shower screen door open showing dark glass interior reflection

Tinted Shower Screen Design Features

With the door open, you can see how dark the grey glass appears - this tinted shower screen gives privacy even in bright bathrooms. The strong reflection shows the toilet and bathroom features, proving how the mirror effect works. The satin black hardware matches perfectly with the dark glass, creating a coordinated modern look.

We designed this as a corner entry shower enclosure to make the most of the bathroom space. The hinged door can swing both inward and outward for flexible access. Our UV-glued panels where the two glass pieces meet ensure the panels are properly bonded and secure.

Product Specification

Style

Corner Shower Enclosure

Metal Finish

Satin Black

Glass Type

10mm Grey Glass

Frame Style

Frameless

Special Features

Shaped Ceiling, UV-glued panels, Tinted Glass

Price Range

£££

Product Dimensions

Width

1400mm

Depth

900mm

Height

2100mm

Custom sizes available - contact us for bespoke measurements

Tinted Shower Enclosure Manufacturing Schedule

Frameless corner installations rely on precise glass-to-glass connections and minimal hardware. Your Tinted Shower Enclosure timeline depends on measurement accuracy and wall preparation.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your corner is tiled and both walls are ready for frameless installation. We'll measure the exact angles for glass-to-glass connections, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 2 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 14 working days total with precise measurements taken in one visit.

14
Working Days Total
8
Production Days
2
Days On-Site

Tiling Not Ready

Extended Timeline

Your corner walls need tiling before frameless installation. We'll take rough measurements for design visualization, then return for precise measurements once both walls are tiled.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 2 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 16 working days if tiling is ready when design is confirmed.

16
Working Days Minimum
12
Production Days
2
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Configure Your Tinted Glass Shower Enclosure

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+