This black sliding shower door showcases our ability to adapt to challenging spaces in London. With a custom glass cut-out to work around an existing wall shelf, we created a seamless shower solution that combines style with smart design.
The client approached us with a fixed screen and a wall-mounted metal shelf that couldn't be removed. Our task was to enclose the shower space completely without compromising on design or function.
We designed a custom shower enclosure with a precisely measured notch in the glass to fit around the existing wall shelf, allowing the door to close fully and create a watertight shower space.
For this compact bathroom, a sliding door was the perfect solution. The frameless door with black hardware creates a striking contrast against the marble tiling while maximizing the usable shower space.
Our high-quality rolling systems ensure smooth, quiet operation through our gliding door systems. The 1300 x 2100mm enclosure was designed to fit perfectly in the available space.
Sliding Shower Door
Black
10mm Clear Glass
Frameless
Glass Cut-out
££
Frameless sliding systems require precision engineering for smooth operation. Your Black Sliding Shower Door production includes specialized track mechanisms and glass preparation.
📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.
✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.
Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.
💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Plan Your Black Sliding Shower DoorEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.