Double Shower Doors - London

These bespoke double shower doors show how we handle high-end property installations in London. Working with the refurbishment contractor and architect, we integrated the hinges directly into the marble stone walls for a flush, clean finish.

Double shower doors partially open inwards showing marble walls and ultra clear glass panels

Double Doors with Inward Opening

This view shows the double shower doors partially open inwards, displaying how both doors can swing into the shower space. The frameless design uses 10mm ultra clear glass that keeps the marble walls as the main feature while providing complete water protection.

The doors feature self-centering mechanisms that help them close properly every time. We worked closely with the contractor to create small recessed pockets in the marble stone where our swing door work ensures perfect hinge plate alignment flush with the stone surface.

Close-up view of polished nickel handles and door seals on double shower doors

Polished Nickel Hardware Details

The close-up view shows the tall polished nickel handles that the client selected for this design. These long handles provide excellent grip and add to the high-end look that works well with the marble surroundings.

Each door uses minimalistic seals that prevent water leakage while keeping the clean lines. The hardware is designed to work smoothly with the self-centering mechanism, making daily use effortless even with the substantial weight of the ultra clear glass panels.

Double shower doors closed showing flush-integrated hinges in marble stone walls

Flush Wall Integration

With both doors closed, you can see how the hinges are integrated flush into the marble walls. This wasn't standard installation - we collaborated with the architect and contractor from the design stage to make sure everything aligned perfectly.

The contractor created precise recessed areas in the stone walls where our hinge plates sit completely flush. This attention to detail means the doors appear to float against the marble without any visible fixings breaking the clean stone lines.

Product Specification

Style

Shower Doors

Metal Finish

Polished Nickel

Glass Type

10mm Ultra Clear

Frame Style

Frameless

Special Features

Minimalistic Door Seals, Long Handles

Price Range

££

Product Dimensions

Width

1300mm

Height

2200mm

Custom sizes available - contact us for bespoke measurements

How Long Does Double Shower Doors Take to Manufacture?

Frameless designs emphasize clean lines and minimal hardware for maximum visual impact. Your Double Shower Doors timeline depends on precise measurements and tiling completion.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 1 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.

13
Working Days Total
8
Production Days
1
Days On-Site

Tiling Not Ready

Extended Timeline

Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 1 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.

15
Working Days Minimum
11
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Shower Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+