These bespoke double shower doors show how we handle high-end property installations in London. Working with the refurbishment contractor and architect, we integrated the hinges directly into the marble stone walls for a flush, clean finish.
This view shows the double shower doors partially open inwards, displaying how both doors can swing into the shower space. The frameless design uses 10mm ultra clear glass that keeps the marble walls as the main feature while providing complete water protection.
The doors feature self-centering mechanisms that help them close properly every time. We worked closely with the contractor to create small recessed pockets in the marble stone where our swing door work ensures perfect hinge plate alignment flush with the stone surface.
The close-up view shows the tall polished nickel handles that the client selected for this design. These long handles provide excellent grip and add to the high-end look that works well with the marble surroundings.
Each door uses minimalistic seals that prevent water leakage while keeping the clean lines. The hardware is designed to work smoothly with the self-centering mechanism, making daily use effortless even with the substantial weight of the ultra clear glass panels.
With both doors closed, you can see how the hinges are integrated flush into the marble walls. This wasn't standard installation - we collaborated with the architect and contractor from the design stage to make sure everything aligned perfectly.
The contractor created precise recessed areas in the stone walls where our hinge plates sit completely flush. This attention to detail means the doors appear to float against the marble without any visible fixings breaking the clean stone lines.
Shower Doors
Polished Nickel
10mm Ultra Clear
Frameless
Minimalistic Door Seals, Long Handles
££
Frameless designs emphasize clean lines and minimal hardware for maximum visual impact. Your Double Shower Doors timeline depends on precise measurements and tiling completion.
📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.
✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.
Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.
💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Plan Your Shower DoorEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.