Double Shower Enclosure - Reading

This double shower enclosure creates a spacious three-sided glass surround designed for two people. Located in Reading, this installation features dual shower heads, circular hole handles, and a well-planned layout with skylight above for excellent natural lighting.

Double shower enclosure with two swing doors, dual shower heads, and skylight above in bathroom with copper bath

Spacious Two-Person Design

This three-sided double shower enclosure connects to a single tiled wall, creating plenty of space for two people to shower together or separately. Each side has its own entry door - left and right - with dual shower heads and controls for individual use.

The skylight above floods the space with natural light during the day, while the copper bath adds warmth to the room. You can also see our frosted screen with door for the WC on the right side of the bathroom.

Inside view of double shower enclosure showing twin shower heads, herringbone tiles, and circular hole handles

Circular Hole Handles and Twin Showers

Instead of traditional handles, we created 50mm circular holes with polished edges in each door. The dual shower system provides separate controls and handhelds, though both share the same linear drain for efficient water management.

Through our shower enclosure installations, we create flexible spaces for couples who want individual control. The herringbone tile pattern creates an attractive backdrop, while the height stops just below the ceiling for proper ventilation with air extraction vents on each side.

Three-sided double shower enclosure with both doors closed and polished chrome fittings

Advanced Glass-to-Glass Construction

The large 1400mm front panel sits recessed into a floor groove we prepared in advance. We glued 200mm return panels to each side for extra strength, then added two reinforcement bars above the enclosure for maximum safety.

The doors are fixed glass-to-glass so they won't hit the wall moulding when opened. We installed flush U-channels in the wall before tiling, so the glass appears to emerge directly from the wall with no visible fixtures.

Complete bathroom view showing double shower enclosure, copper bath, and green wall paneling

Collaborative Design and Planning

This clean installation shows the benefits of early collaboration. The client approached us before the tiles were laid, allowing us to work with the architect and contractors to find the optimal shower design and bathroom layout.

The polished chrome finish coordinates perfectly with the existing bathroom fittings. The skylight provides excellent natural light, while the green wall paneling creates a calming atmosphere that complements the clear glass enclosure.

Product Specification

Style

Three-sided Shower Enclosure

Metal Finish

Polished Chrome

Glass Type

10mm Clear Glass

Frame Style

Frameless

Special Features

UV-bonded Glass-to-Glass, Double Doors, Wall&Floor Recessed Glass

Price Range

£££

Product Dimensions

Width

1400mm

Depth

1000mm

Height

2100mm

Custom sizes available - contact us for bespoke measurements

How Long Does Double Shower Enclosure Take to Manufacture?

Three-sided frameless designs require UV-bonded glass joints and structural calculations. Manufacturing time for your Double Shower Enclosure varies based on tiling completion.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

All walls are tiled, the floor is ready for frameless glass installation. We'll capture precise dimensions for UV-bonded corner joints and proceed with glass cutting.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 2 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 14 working days total with precise measurements taken in one visit.

14
Working Days Total
8
Production Days
2
Days On-Site

Tiling Not Ready

Extended Timeline

Your three walls need tiling before frameless glass installation. We'll measure basic dimensions for design, then return for exact measurements for UV-bonded joints.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 2 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 16 working days if tiling is ready when design is confirmed.

16
Working Days Minimum
12
Production Days
2
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Configure Your Shower Enclosure

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+