Double Sliding Shower Doors - Bath

This corner entry sliding shower enclosure features two sliding doors creating an elegant frameless design with satin brass finish in Bath. The bespoke shower solution demonstrates our ability to create custom finishes that weren't previously available on the market.

Corner entry sliding shower enclosure with satin brass finish and closed doors in Bath

Corner Entry Sliding System

This unique corner entry sliding shower enclosure features two sliding doors that create a stylish entrance from the corner. At the time of installation, satin brass finish wasn't available with corner entry sliding systems for showers.

To achieve the desired look, we improvised by anodising the parts in satin brass. The custom shower solution perfectly complements the bathroom's design while maintaining functionality.

Corner entry sliding shower enclosure with satin brass finish and open doors in Bath

Elegant Functionality

The design includes tiny doorknobs that maintain the minimalist aesthetic while providing practical functionality. When opened, the doors slide smoothly along their tracks to create a spacious entrance from the corner of the enclosure.

While the special finish increases the price, the result is truly unique through our gliding solutions that wouldn't be possible with standard options. If standard finishes were used, the cost would be significantly lower.

Product Specification

Style

Corner Entry Sliding Shower

Metal Finish

Satin Brass

Glass Type

8mm Ultra Clear Glass

Frame Style

Frameless

Special Features

Brass Anodised Finish

Price Range

£££

Product Dimensions

Width

900mm

Depth

900mm

Height

2100mm

Custom sizes available - contact us for bespoke measurements

Double Sliding Shower Doors Delivery Timeline

Frameless corner installations rely on precise glass-to-glass connections and minimal hardware. Your Double Sliding Shower Doors timeline depends on measurement accuracy and wall preparation.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your corner is tiled and both walls are ready for frameless installation. We'll measure the exact angles for glass-to-glass connections, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 1 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.

13
Working Days Total
8
Production Days
1
Days On-Site

Timeline Considerations for This Project

  • If brass sliding profiles are not in our stock, we may need to do bespoke anodising which adds processing time and can add two extra weeks. We can inform you of the actual timing on the day of your enquiry based on current stock levels.

Tiling Not Ready

Extended Timeline

Your corner walls need tiling before frameless installation. We'll take rough measurements for design visualization, then return for precise measurements once both walls are tiled.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 1 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.

15
Working Days Minimum
11
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Sliding Shower Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+