Featuring a full perimeter brass frame and fluted glass, this traditional-style shower door was installed in London as part of a bespoke service. The rough-textured side of the glass faces the bathroom for privacy and easy maintenance inside.
The shower door and side panel are fully enclosed by a polished brass frame. The reeded glass adds privacy while allowing light to move through the bathroom naturally.
We fabricate and finish all our custom metal work to match each room’s architecture, ensuring a clean, strong fit across all framed elements.
The brass profiles run seamlessly along all sides of the glass. Corners and edges are cut and polished by hand to create tight-fitting, visible joints without external fixing plates.
You’ll find similar techniques used in our shower enclosures where structural framing and visual clarity work together.
The hinges are integrated directly into the brass framing, with solid internal supports. A fine clear mastic line finishes the edges where the brass meets the floor and side wall tiles.
All visible components were finished in polished brass, ensuring consistent tone and durability over time.
Fluted reeded glass softens the view while maintaining brightness in the bathroom. The rough side faces outward to protect the texture, while the inside remains smooth for cleaning.
This enclosure was completed as part of a full-service package — from site survey to final polishing — using bespoke production methods at every stage.
Inline Framed Enclosure
Polished Brass
Fluted (Reeded) 8mm
Full Traditional Frame
Reeded Glass, Polished Brass Frame, Bespoke Towel Rail
££££
Fluted glass requires specialized processing and handling during production. Your Fluted Glass Shower Door timeline includes additional time for textured glass manufacturing.
📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for fluted glass installation. We'll take precise measurements and begin the specialized textured glass production process.
✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.
Your walls need tiling before fluted glass installation. We'll take rough measurements for design visualization, prepare for specialized glass production, then finalize measurements after tiling.
💡 Flexible Timeline: The waiting period begins after frame production (day 24) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 40 working days if tiling is ready when frames are done.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.