This stunning fluted shower screen serves as a room divider between a bathroom and bedroom. The light bronze frame with grid pattern complements the reeded glass perfectly, offering slight privacy while allowing light to flow between spaces.
Our team installed this large fluted shower screen measuring 1600 x 2200mm as a stylish room separator. The reeded glass provides slight privacy between spaces while still allowing light to pass through.
The bronze frame with grid design adds a touch of luxury to both rooms. We created this custom shower screen to match the client's interior design vision perfectly.
The reeded glass texture creates a beautiful rippling effect when light passes through it. This laminated toughened glass option offers improved safety while maintaining the elegant fluted appearance.
Framed screens like this one enhance rigidity and protect glass edges. We offer various panel designs that can be finished with different options to match your bathroom fixtures.
Glass Wall
Light Bronze
Reeded Laminated Toughened Glass
Framed with Grid
Bespoke Finish, Large Size
£££
Walk-in designs prioritize seamless integration with your bathroom layout. The Fluted Shower Screen timeline varies based on wall preparation and structural requirements.
📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for fluted glass installation. We'll take precise measurements and begin the specialized textured glass production process.
✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.
Your walls need tiling before fluted glass installation. We'll take rough measurements for design visualization, prepare for specialized glass production, then finalize measurements after tiling.
💡 Flexible Timeline: The waiting period begins after frame production (day 24) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 38 working days if tiling is ready when frames are done.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Design Your Fluted Glass Shower ScreenEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.