Fluted Shower Screen - Birmingham

This stunning fluted shower screen serves as a room divider between a bathroom and bedroom. The light bronze frame with grid pattern complements the reeded glass perfectly, offering slight privacy while allowing light to flow between spaces.

Bronze framed fluted shower screen with grid pattern viewed from bedroom side, serving as an elegant room divider

Elegant Room Divider

Our team installed this large fluted shower screen measuring 1600 x 2200mm as a stylish room separator. The reeded glass provides slight privacy between spaces while still allowing light to pass through.

The bronze frame with grid design adds a touch of luxury to both rooms. We created this custom shower screen to match the client's interior design vision perfectly.

Reeded glass shower screen with bronze frame viewed from bathroom side with marble walls and yellow flooring protection

Privacy with Style

The reeded glass texture creates a beautiful rippling effect when light passes through it. This laminated toughened glass option offers improved safety while maintaining the elegant fluted appearance.

Framed screens like this one enhance rigidity and protect glass edges. We offer various panel designs that can be finished with different options to match your bathroom fixtures.

Product Specification

Style

Glass Wall

Metal Finish

Light Bronze

Glass Type

Reeded Laminated Toughened Glass

Frame Style

Framed with Grid

Special Features

Bespoke Finish, Large Size

Price Range

£££

Product Dimensions

Width

1600mm

Height

2200mm

Custom sizes available - contact us for bespoke measurements

Production Time for Fluted Shower Screen

Walk-in designs prioritize seamless integration with your bathroom layout. The Fluted Shower Screen timeline varies based on wall preparation and structural requirements.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready for fluted glass installation. We'll take precise measurements and begin the specialized textured glass production process.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

26
Working Days Total
22
Production Days
1
Days On-Site

Timeline Considerations for This Project

  • Brushed bronze finish requires an extended anodising process compared to standard finishes, adding time to frame production.
  • Reeded, toughened, and laminated glass requires combining multiple processing steps, extending glass production time compared to standard clear glass.

Tiling Not Ready

Extended Timeline

Your walls need tiling before fluted glass installation. We'll take rough measurements for design visualization, prepare for specialized glass production, then finalize measurements after tiling.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 24) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 38 working days if tiling is ready when frames are done.

38
Working Days Minimum
14
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Design Your Fluted Glass Shower Screen

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+