This full height shower screen was made from toughened clear 10mm glass and installed between a marble-clad and plastered wall. It spans from tray to ceiling and includes design, production, and installation as one complete package.
This glass spans 2400mm from tray to ceiling with no visible framing. It’s recessed 10mm into the marble slab and plastered wall for a flush, fully integrated look.
Top and bottom edges were sealed with clear mastic, forming a tight bond without breaking the lines of the shower. It’s part of our custom approach for complex bathrooms.
We left a 2mm expansion gap at the ceiling and tray edge, then sealed both with clear silicone to reduce glare and keep the join nearly invisible.
The panel acts as a walk-in screen with no door or track. Its simplicity and clarity help brighten the room. You’ll find more like it in our shower screens collection.
At 1300mm wide and 2400mm high, this screen was designed to hold firmly in place without a visible reinforcement arm or bracket. Structural depth came from its size and flush wall contact.
We used easy-clean coating as standard to keep the glass looking clear over time. This type of screen is ideal when you want maximum openness in a fitted layout.
Walk-in Screen
None
Clear 10mm
Frameless
Recessed Glass, Large Size
££
Walk-in frameless designs create seamless shower entries with minimal visual interruption. The Full Height Shower Screen timeline prioritizes structural integrity and clean lines.
📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.
✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.
Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.
💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Design Your Shower ScreenEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.