This wall-to-wall frameless shower enclosure features ultra clear glass, antique copper hinges, and recessed wall glass. A clean finish, achieved with slim seals and matching materials, completes the tailored design.
We designed this frameless inline shower to fit tightly between two tiled walls. Fixed screens were recessed into the surfaces, giving a secure, low-profile fit without external support bars.
The panels use ultra clear, toughened glass with a hydrophobic coating for easy cleaning. The seals are minimal, and the joints stay hidden, preserving the flow of light and lines throughout the bathroom.
We used antique copper hinges to hold the door in line with the fixed screens. These fittings matched the client’s chosen interior and offered strength without adding bulk to the enclosure.
The panels use ultra clear, toughened glass with a hydrophobic coating for easy cleaning. The seals are minimal, and the joints stay hidden, preserving the flow of light and lines throughout the bathroom. Every element was built as part of our custom shower enclosures service.
Inline Shower Enclosure
Antique Copper
Ultra Clear 10mm
Frameless
Towel Rail, Wall Recessed
££ *
Frameless designs emphasize clean lines and minimal hardware for maximum visual impact. Your Frameless Inline Shower Door timeline depends on precise measurements and tiling completion.
📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.
✓ Streamlined Process: Frameless options require less time than framed equivalents - just 14 working days total with precise measurements taken in one visit.
Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.
💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 16 working days if tiling is ready when design is confirmed.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Plan Your Frameless Shower DoorEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.