Short Shower Screen - Cookham

This short shower screen project shows the key things to consider when space is tight. While small screens work well in some situations, they come with water protection challenges that need careful planning from the start.

Short shower screen Cookham showing small glass panel with brass fixtures and marble tiles

Short Shower Screen Design Challenges

This small 600mm shower screen creates a clean, modern look but shows why we normally recommend wider panels. The narrow glass panel stops most of the water from the overhead shower but leaves a large opening where splashes can escape. This works well when some water on the floor is expected, like near pool areas.

The brushed brass U-channel fixing gives a quality finish that matches the shower fittings perfectly. For challenging spaces like this, our screen service helps you understand what works best for your specific bathroom layout.

Short shower screen installation with clear glass panel and wide opening for entry

Water Protection Considerations

From this angle you can see how much open space remains around the short screen panel. Water from washing your hair or handheld showers can easily reach the bathroom floor through this wide entrance. The marble-effect tiles and quality drainage help manage this, but it's something to plan for.

Many clients ask to add a door after seeing how much water escapes with small screens. This costs more and changes the whole design, so it's better to think about this before we start your project.

Walk-in shower with small glass screen demonstrating limited water protection coverage

Second Short Screen Installation

We installed another identical 600mm screen in a second bathroom of the same house, using the same brushed brass hardware and clear glass specification. This shows how consistent design choices can work across multiple rooms while maintaining the same water protection challenges we discussed.

Both screens demonstrate that small panels work when clients understand the water splash limitations. The matching brass finish creates a unified look throughout the house, even though each bathroom needs careful floor drainage planning.

Product Specification

Style

Walk-in Shower Screen

Metal Finish

Brushed Brass

Glass Type

10mm Clear

Frame Style

Frameless

Special Features

U-channel fixing

Price Range

£

Product Dimensions

Width

600mm

Height

2000mm

Custom sizes available - contact us for bespoke measurements

How Long Does Walk-in Short Shower Screen Take to Manufacture?

Walk-in frameless designs create seamless shower entries with minimal visual interruption. The Walk-in Short Shower Screen timeline prioritizes structural integrity and clean lines.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 2 days
Create and approve your frameless design
Glass Production 7 days
Cutting, tempering, and processing
Installation 1 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 11 working days total with precise measurements taken in one visit.

11
Working Days Total
7
Production Days
1
Days On-Site

Tiling Not Ready

Extended Timeline

Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 2 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 7 days
Cut to exact measurements
Installation 1 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 3) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 4. The total timeline shows the minimum 13 working days if tiling is ready when design is confirmed.

13
Working Days Minimum
10
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Design Your Walk-In Shower Screen

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+