White Shower Door - London

This white shower door project shows how bespoke powder coating creates a fresh, bright bathroom design. We installed two matching partitions with doors and inline screens, creating an elegant corridor between the shower and WC areas. The white frames work beautifully with the fluted glass to provide privacy while keeping the space feeling open and light.

White framed fluted glass corridor between two matching shower partitions with brass towel warmers

Matching White Partitions Create Elegant Corridor

This walkway shows our two matching white shower partitions installed as mirror images of each other. Each features a door that opens inward plus an inline fixed screen, all finished in crisp white powder coating. The fluted glass provides privacy for both the shower and WC areas while letting natural light flow through the space.

We designed these partitions to work together, creating a sophisticated corridor that connects different areas of the bathroom. The white frames blend seamlessly with the bathroom's clean design, while the brass towel warmers and built-in shelving add warmth and functionality. Our custom design expertise ensures perfect alignment and matching proportions.

Close-up of white framed shower door with fluted glass panels and horizontal divider bar

White Powder Coating with Horizontal Towel Rail

The white powder coating on these frames requires special preparation and a longer production process compared to our stock finishes. Every component receives multiple coats to ensure a perfect, durable white finish that won't yellow over time. The horizontal bar works as a towel rail on the outside.

Inside the shower, we fitted a square style knob that allows the door to open parallel to the marble wall. The frame sits flush with the bathroom wall surface, achieved by installing hidden plates beneath the stone for secure attachment.

White shower door with inline screen featuring fluted glass and white powder coated frame

Fluted Glass Provides Privacy with Light

The 4+4mm laminated fluted glass offers an ideal balance of privacy and light transmission. Unlike frosted glass which can feel cold and stark, the fluted pattern creates a warm, textured appearance that adds visual interest. The vertical lines complement the bathroom's design while providing enough distortion for privacy.

Each glass panel goes through a complex production process - both 4mm sheets are toughened separately, then laminated together for extra safety. This creates incredibly strong glass that's much safer than standard toughened glass alone. The fluted pattern runs continuously across both the door and fixed panel for a seamless look.

White framed shower partition with door closed showing full height fluted glass panels

Perfect Alignment with Existing Architecture

These white framed partitions align perfectly with the bathroom's existing doorways and architectural features. We carefully measured during our survey to ensure the glass panels would line up with the door frames and wall edges. This attention to detail creates a cohesive design where everything feels intentionally placed.

The white powder coating matches the room's white paintwork perfectly. We sealed the entire perimeter with white mastic to match the frames, ensuring no water leaks while maintaining the clean aesthetic. The timber flooring outside stays completely dry thanks to our precise installation.

White shower door opened inward revealing dramatic black and white marble shower interior

Luxurious Marble Interior Revealed

Opening the shower door reveals the stunning black and white veined marble interior. The dramatic stone creates a beautiful contrast with the white frames and adds luxury to the shower experience. Built-in shelving niches provide practical storage while maintaining the clean lines of the design.

The gold shower fixtures and fittings complement the warm tones in the marble veining. We positioned our glass to showcase this beautiful interior while ensuring water stays contained within the shower area. The door opens smoothly inward, allowing easy access without taking up corridor space when open.

Walkway view between white framed glass partitions leading to bathroom with freestanding bath

Corridor Design Connects Bathroom Spaces

This view shows how the glass corridor creates flow between different bathroom areas. The matching white partitions frame the walkway beautifully, leading to the bright bathroom space with its freestanding bath. Natural light from the window travels through the fluted glass, illuminating the entire area.

White shower enclosures like these are less common than black or brass options, but they create a fresh, timeless look that works particularly well in bright, modern bathrooms. The clean lines and crisp finish will never go out of style, making this an excellent long-term investment in bathroom design.

White shower doors both opened inward showing flexible corridor design with fluted glass

Flexible Design with Inward Opening Doors

Both white doors open fully inward, demonstrating the flexibility of this design. When needed, both areas can be completely opened up, creating an even more spacious feeling. The doors align perfectly when closed, maintaining the clean corridor appearance that makes this bathroom so striking.

This project showcases the level of customization possible with our service. From the bespoke white powder coating to the specific door configurations and built-in towel rail functionality, every detail was tailored to the client's vision. The result is a bathroom that feels both luxurious and perfectly suited to daily use.

Product Specification

Style

Alcove Shower Enclosure

Metal Finish

White Powder Coated

Glass Type

4+4mm Toughened & Laminated Fluted Glass

Frame Style

Framed

Special Features

White Powder Coating, Bespoke Towel Rail, Laminated Glass

Price Range

££££

Product Dimensions

Width

1400mm

Height

2300mm

Custom sizes available - contact us for bespoke measurements

How Long for White Shower Door with Screen Installation?

Fluted glass requires specialized processing and handling during production. Your White Shower Door with Screen timeline includes additional time for textured glass manufacturing.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready for fluted glass installation. We'll take precise measurements and begin the specialized textured glass production process.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

26
Working Days Total
22
Production Days
2
Days On-Site

Timeline Considerations for This Project

  • The frame production uses white powder coating which takes longer to produce compared to our stock finishes. All parts need to be prepared and coated to ensure a perfect white finish.
  • The glass production is from reeded glass with ultra clear, both 4mm laminated together and toughened before that. This process takes more time than regular glass but provides much safer glass.
  • The installation takes two days because the product is large and complex, making the process of installation longer than standard showers due to the intricate framework alignment required.

Tiling Not Ready

Extended Timeline

Your walls need tiling before fluted glass installation. We'll take rough measurements for design visualization, prepare for specialized glass production, then finalize measurements after tiling.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 21) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 38 working days if tiling is ready when frames are done.

38
Working Days Minimum
17
Production Days
2
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Shower Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+