This striking black frame shower screen brings modern style to a London bathroom. The full-height design creates a clean and open feel while the black frame adds bold contrast against the light microcement walls and marble floor.
The slim black frame of this shower screen creates a bold statement in this neutral bathroom. Our 30mm frame gives the perfect balance of structure and sleekness while maintaining the strength needed for daily use.
We can match any size requirements for our shower screens. This particular screen stands at 2600mm tall, reaching from floor to ceiling to create a seamless look.
We used 10mm ultra-clear glass for this shower screen to ensure maximum transparency. Unlike standard glass with its greenish tint, our ultra-clear option shows the true colours of your bathroom tiles and walls.
Each panel is thoroughly tested and treated with our easy-clean coating that helps repel limescale and water spots. Our screen installations use toughened safety glass built to last.
Walk-in Shower Screen
Black
10mm Ultra Clear Glass
Framed
Full Height
££
Walk-in designs prioritize seamless integration with your bathroom layout. The Black Frame Shower Screen timeline varies based on wall preparation and structural requirements.
📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready. We'll take precise measurements and photos during our initial visit, then proceed with design and parallel production for faster delivery.
✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.
Your walls need tiling. We'll take initial measurements for visualization, start frame production early, then return for final measurements once tiling is complete.
💡 Flexible Timeline: The waiting period begins after frame production (day 7) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 19 working days if tiling is ready when frames are done.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Design Your Black Shower ScreenEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.