Black Frame Shower Screen - London

This striking black frame shower screen brings modern style to a London bathroom. The full-height design creates a clean and open feel while the black frame adds bold contrast against the light microcement walls and marble floor.

Black frame walk-in shower screen with ultra-clear glass in London bathroom with marble floor

Minimalist Black Framing

The slim black frame of this shower screen creates a bold statement in this neutral bathroom. Our 30mm frame gives the perfect balance of structure and sleekness while maintaining the strength needed for daily use.

We can match any size requirements for our shower screens. This particular screen stands at 2600mm tall, reaching from floor to ceiling to create a seamless look.

Full height black frame shower screen with minimalist design in modern London bathroom

Ultra-Clear Glass Quality

We used 10mm ultra-clear glass for this shower screen to ensure maximum transparency. Unlike standard glass with its greenish tint, our ultra-clear option shows the true colours of your bathroom tiles and walls.

Each panel is thoroughly tested and treated with our easy-clean coating that helps repel limescale and water spots. Our screen installations use toughened safety glass built to last.

Product Specification

Style

Walk-in Shower Screen

Metal Finish

Black

Glass Type

10mm Ultra Clear Glass

Frame Style

Framed

Special Features

Full Height

Price Range

££

Product Dimensions

Width

900mm

Height

2300mm

Custom sizes available - contact us for bespoke measurements

How Long Does Black Frame Shower Screen Take to Manufacture?

Walk-in designs prioritize seamless integration with your bathroom layout. The Black Frame Shower Screen timeline varies based on wall preparation and structural requirements.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready. We'll take precise measurements and photos during our initial visit, then proceed with design and parallel production for faster delivery.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

14
Working Days Total
10
Production Days
1
Days On-Site

Timeline Considerations for This Project

  • Black frames are much faster to produce compared to bespoke finishes. We keep black finish in stock, so your project can move quickly through production without waiting for custom anodising or powder coating.

Tiling Not Ready

Extended Timeline

Your walls need tiling. We'll take initial measurements for visualization, start frame production early, then return for final measurements once tiling is complete.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 7) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 19 working days if tiling is ready when frames are done.

19
Working Days Minimum
12
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Design Your Black Shower Screen

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+