This bronze shower door showcases our ability to match bathroom fixtures perfectly. The dark bronze frame complements the marble walls and floor, creating a cohesive and luxurious look for this high-end Central London property.
The dark bronze finish adds depth against the light marble background. This anodised finish is highly resistant to daily wear and moisture, making it both practical and beautiful for bathroom use.
We designed this door with a fully framed structure to enhance safety and style. The frame creates a striking contrast with the ultra clear glass, highlighting the clean lines of this modern bathroom. Caledora bespoke service includes custom metalwork in any finish.
This full height door stretches from floor to ceiling, maximizing the shower space. The clean lines prevent water leakage while creating a sleek, uninterrupted look that enhances the bathroom's spacious feel.
The ultra clear 4+4 toughened laminated glass offers superior safety compared to standard options. Unlike regular glass, if broken, these panels remain intact rather than shattering into pieces, providing peace of mind.
We installed this hinged door with precision hardware to ensure smooth operation. The high-quality hinges match the frame finish and support the weight of the glass without straining the wall fixtures.
The frame includes hidden gaskets that create a tight seal when the door closes. This thoughtful detail prevents water leakage while maintaining the clean lines that make this bronze shower door so visually appealing.
Our installation team worked carefully to align the door perfectly with the marble tiling. This attention to detail ensures that the threshold seals tightly against the floor, preventing water from escaping.
This shower door demonstrates how frameless glass can be enhanced with metal accents. The bronze frame adds definition and structure while still allowing the beautiful marble to remain the focal point.
Single Door
Anodised Dark Bronze
Ultra Clear 4+4 Toughened Laminated Glass
Fully Framed
Toughened Laminated Glass, Bespoke Anodising
££££
Premium bronze finishes require specialized anodizing processes. Your Bronze Shower Door timeline includes custom metal treatment for lasting beauty.
📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for premium bronze installation. We'll take exact measurements and begin the custom anodizing process.
✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.
Your walls need tiling before bronze installation. We'll take initial measurements for design, start the custom anodizing process, then return for final measurements.
💡 Flexible Timeline: The waiting period begins after frame production (day 24) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 37 working days if tiling is ready when frames are done.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Plan Your Bronze Shower DoorEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.