Brushed Brass Shower Door - London

This brushed brass shower door shows how a quality metal finish can transform a bathroom design. The single swing door opens inwards to work with the bathroom layout, while the brushed brass hardware adds a warm, elegant touch against the dark marble tiles.

Frameless brushed brass shower door in luxury bathroom with dark marble tiles and white freestanding bath

Single Door Design with Wide Entry

This single shower door gives you the full width of the opening for easy access. The client chose one wide door instead of splitting the space with a fixed panel, creating a generous entry that feels open and welcoming. The brushed brass hinges and handle complement the contemporary bathroom design perfectly, adding warmth against the cool marble surfaces.

Our frameless door design keeps the focus on the beautiful brushed brass hardware while the 10mm ultra clear glass provides strength and clarity. The minimalistic door seals around the edges stop water without creating thick PVC lines that would spoil the clean look of this luxury bathroom.

Brushed brass shower door with handle and hinges in contemporary bathroom with black stone walls

Inward Opening Door for Space Efficiency

The door swings inwards only because of how the bathroom was designed, with the vanity unit positioned right in front of the shower entry. This inward opening actually works well in this space, keeping the door out of the way when you're moving around the bathroom. The brushed brass handle is positioned perfectly for comfortable use.

We installed this door with wall-mounted hinges that attach directly to the reinforced wall behind the marble tiles. This gives you the most reliable fixing method for long-term use. Through our opening mechanisms, we create doors that work perfectly with your specific bathroom layout and daily routine.

Product Specification

Style

Shower Door

Metal Finish

Brushed Brass

Glass Type

10mm Ultra Clear

Frame Style

Frameless

Special Features

Minimalistic Door Seals, Wide Entry

Price Range

£

Product Dimensions

Width

880mm

Height

2000mm

Custom sizes available - contact us for bespoke measurements

Production Time for Brushed Brass Shower Door

Frameless designs emphasize clean lines and minimal hardware for maximum visual impact. Your Brushed Brass Shower Door timeline depends on precise measurements and tiling completion.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 2 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 1 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 12 working days total with precise measurements taken in one visit.

12
Working Days Total
8
Production Days
1
Days On-Site

Tiling Not Ready

Extended Timeline

Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 2 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 1 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 3) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 4. The total timeline shows the minimum 14 working days if tiling is ready when design is confirmed.

14
Working Days Minimum
11
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Brass Shower Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+