Black Framed Folding Shower Door - London

This space-saving folding shower door was the perfect solution for a narrow London bathroom. The black framed folding design allows the door to fold against the wall, maximizing the limited space while creating a striking visual contrast.

Black framed folding shower door in London with herringbone tile pattern

Space-Saving Folding Design

This slim folding shower door folds neatly against the wall when open. This smart design choice leaves more room for movement in the narrow bathroom space while maintaining a sleek and modern look.

The setup was ideal for this tight space where a standard swing door would block access to other bathroom fixtures. Our folding door solutions allow the door panels to fold inward, creating a compact profile.

Closed black frame folding shower door with clear glass in narrow bathroom

Fully Framed Black Profile

The black anodised frame enhances this folding shower door with bold contrast against the light walls and herringbone tile pattern. This framing adds industrial style that complements the modern fixtures.

We installed this custom-made shower with a sturdy black frame that not only looks stunning but also provides excellent support for the glass panels. The frame houses hidden magnets for a secure closure.

Open black framed folding shower door showing interior shower space

Trackless Folding System

Unlike typical folding doors, this folding shower door features a trackless top design. Without visible runners, the top maintains a clean, uncluttered appearance while still operating smoothly and quietly.

The shower enclosure includes two strategically placed doorknobs for easy opening and closing. The folding door stays securely closed thanks to hidden magnets within the frame.

Product Specification

Style

Bifold Door

Metal Finish

Black

Glass Type

8mm Ultra Clear

Frame Style

Fully Framed

Special Features

Bifold Entry Modification

Price Range

££££

Product Dimensions

Width

1000mm

Height

2200mm

Custom sizes available - contact us for bespoke measurements

When Will Your Folding Shower Door Be Ready?

Bifold doors involve complex hinge systems and space-saving engineering. Manufacturing your Folding Shower Door requires careful planning and precise measurements.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready. We'll take precise measurements and photos during our initial visit, then proceed with design and parallel production for faster delivery.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

16
Working Days Total
12
Production Days
2
Days On-Site

Timeline Considerations for This Project

  • Bifold doors require perfect alignment during installation, which may take 1-2 days to ensure smooth operation. The black frame uses our stock finish, allowing faster frame production time.

Tiling Not Ready

Extended Timeline

Your walls need tiling. We'll take initial measurements for visualization, start frame production early, then return for final measurements once tiling is complete.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 5) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 19 working days if tiling is ready when frames are done.

19
Working Days Minimum
14
Production Days
2
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Shower Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+