This frameless sliding shower door shows how we solve space problems during refurbishment projects. The client needed a sliding door because a large vanity unit was planned for the right side, leaving limited space for a swing door. The chrome track system works perfectly in the narrow opening.
This sliding shower door works perfectly when you have limited space for opening. The door slides behind the fixed panel instead of swinging out into the bathroom. The client chose this design because a large vanity unit will be installed on the right, leaving no room for a normal swing door.
The polished chrome track system looks clean against the herringbone tile pattern. The door stays closed securely while still being easy to slide open when needed. This type of sliding system works well during refurbishment when you need to work around planned bathroom fixtures.
When the door slides open, you can see how narrow the entry is due to the small overall width. The circular hole handle makes it easy to grip and slide the door without adding extra metal hardware. The opening is quite narrow, but it's still comfortable to use for showering.
The 50mm circular hole handle is polished smooth to match the chrome track system. This handle choice keeps the design clean and simple while giving you a good grip for sliding. Through our sliding door installations, we create doors that work perfectly with your bathroom layout constraints.
The chrome tube attaches to both walls and supports the fixed screen and the sliding door. You can see the rollers that let the door glide smoothly along the track. The tube extends all the way to the top of the tiled wall for maximum support and a clean finish.
This track system works differently from hidden ceiling tracks because all the hardware is visible. The rollers are made to handle daily use while staying smooth and quiet. The chrome finish matches other bathroom fixtures and looks good against the herringbone tile pattern.
From inside the shower, you can see how the rollers attach to the door and slide along the track. The minimalistic seals around the edges prevent water from getting out while keeping the clean frameless look. The rollers are designed to carry the weight of the 10mm glass panel smoothly.
The seals are kept as small as possible while still doing their job of keeping water in the shower area. The rolling system runs quietly and needs very little maintenance over time. This setup gives you the space-saving benefits of sliding without complicated mechanisms.
The floor is walk-in level with a guide that supports the bottom of the door. The left and right walls weren't completely flat at the bottom, so we had to angle the glass 10mm on the bottom 200mm to fit properly. You can also see how the glass panels overlap to avoid needing seals between them.
This overlapping design means water can't get between the panels without needing rubber seals that would interrupt the clean glass look. The door guide at floor level keeps everything aligned while you slide the door. Working with curved walls like this requires careful measuring to get the glass to fit perfectly.
Sliding Shower Door
Polished Chrome
10mm Clear Glass
Frameless
Easy Clean Coating
££
Frameless sliding systems require precision engineering for smooth operation. Your Frameless Sliding Shower Door production includes specialized track mechanisms and glass preparation.
📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.
Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.
✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.
Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.
💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.
Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.
Plan Your Frameless Shower DoorEach symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.
Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.
VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.