Shower Screen with Black Grid - London

This striking shower screen with black grid combines modern function with classic style. The walk-in design creates a seamless bathroom flow while the industrial-style frames add character to the beige subway-tiled shower space in this London home.

Elegant black grid shower screen with beige subway tile walls and patterned floor in London bathroom

Industrial Elegance

The black grid shower screen makes a bold statement against the beige subway tiles. Its walk-in design eliminates the need for a door, creating an open feel while still protecting the rest of the bathroom from water spray.

We created this bespoke shower screen with a black frame that adds contrast to the bright bathroom. The grid pattern divides the space visually while allowing light to flow through the ultra-clear glass.

Full view of walk-in black grid shower screen with traditional bathroom fixtures and patterned floor

Perfect Fit Design

This shower fits neatly into the bathroom layout, making smart use of the available space. The black grid frames create a striking contrast with the traditional toilet and basin while complementing the patterned floor tiles.

Our screens are measured and fitted with precision. The 10mm ultra-clear glass provides strength and durability while the black frame ensures the screen remains firmly in place. We specialize in fixed screen installations for different bathroom layouts.

Corner view of black grid shower screen showing detailed frame pattern against beige subway tiles

Quality in Every Detail

The 30mm black frame is reinforced with carbon fibre, making it as strong as steel. We designed this shower screen to stand out as a feature in the bathroom, not just a practical addition.

Every joint in the grid pattern is precisely crafted and the finish is smooth and durable. The frame is anodised in black for long-lasting colour that won't chip or fade with daily use in a wet environment.

Product Specification

Style

Walk-in Shower Screen

Metal Finish

Black

Glass Type

10mm Clear Glass

Frame Style

Framed with Grid

Special Features

Bespoke Finish

Price Range

££

Product Dimensions

Width

1200mm

Height

2000mm

Custom sizes available - contact us for bespoke measurements

Production Time for Shower Screen with Black Grid

Walk-in designs prioritize seamless integration with your bathroom layout. The Shower Screen with Black Grid timeline varies based on wall preparation and structural requirements.

📋 Multiple Items: Each additional shower enclosure may extend Design, Assembly, and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Faster Option

Your walls are tiled and ready. We'll take precise measurements and photos during our initial visit, then proceed with design and parallel production for faster delivery.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your custom design
Parallel Production 20 days
Frame (20d) and Glass (8d) made simultaneously
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

✓ Efficient Process: With tiling complete, we take all measurements in one visit and run frame and glass production simultaneously.

14
Working Days Total
10
Production Days
1
Days On-Site

Timeline Considerations for This Project

  • This project uses our standard black frame finish, allowing for efficient production with our stock materials and standard processes.

Tiling Not Ready

Extended Timeline

Your walls need tiling. We'll take initial measurements for visualization, start frame production early, then return for final measurements once tiling is complete.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial design based on rough measurements
Frame Production 20 days
Can start while tiling is in progress
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Assembly 3 days
Glass fitted into frames
Installation 2 days
Professional on-site installation

💡 Flexible Timeline: The waiting period begins after frame production (day 7) and varies based on your tiling schedule. If your tiling is completed during our frame production period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, assembly, and installation to start as early as day 5 (right after design confirmation). The total timeline shows the minimum 19 working days if tiling is ready when frames are done.

19
Working Days Minimum
12
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Design Your Black Shower Screen

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+