Shower with Sliding Glass Door - Winchester

This sliding shower door shows how we adapt our track systems to work with different bathroom layouts. Instead of sliding behind another glass panel, this door slides behind the tiled wall, giving you the full opening width while the track system attaches directly to the wall structure.

Wide sliding shower door opening to show circular hole handle and track system in hexagonal tiled bathroom

Wide Opening with Wall-Mounted Track

This wide sliding door gives you the full 900mm opening when slid back against the wall. The track system is mounted directly to the wall instead of hanging between glass panels, which required us to modify our standard sliding hardware. The polished chrome track complements the hexagonal bronze tiles beautifully.

We installed wall-mounted brackets that hold the track securely against the reinforced wall structure. This setup allows the door to slide completely behind the tiled wall, giving you maximum entry space while keeping the track system stable and smooth to operate.

Sliding glass door in closed position showing track system and hexagonal bronze-copper wall tiles

Smooth Operation with Modified Track System

You can see how the door sits perfectly aligned when closed, with the track system holding everything in place from above. The bronze hexagonal tiles create a warm contrast against the clear glass and polished chrome hardware. Our modified track system works just as smoothly as our standard setups.

The door has a small guide at the bottom to keep it aligned while it slides on the wall-mounted track above. This setup required careful planning to ensure the track attachment points lined up perfectly with the wall structure and that the door would glide smoothly without binding.

Open sliding door showing 50mm circular hole handle and track modification for wall mounting system

Circular Hole Handle for Clean Lines

Instead of adding a metal handle that would create more hardware to clean and maintain, we created a 50mm circular polished hole in the glass. This gives you a comfortable grip for sliding the door while keeping the design clean and simple. The hole is positioned perfectly for natural hand placement.

The polished circular hole also allows the door to slide further back against the wall because there's no protruding handle to hit the tiles. This design choice gives you a few extra centimeters of opening space, which makes a real difference in a shower entry. Through our sliding options, we create doors that work perfectly with your specific bathroom design.

Sliding shower door track system with polished chrome finish and wall-mounted rollers for smooth operation

No Soft Stopper with Standard Track Design

This type of sliding track system comes without soft stopping mechanisms because the rollers run directly on the chrome tube. While we can install tracks with soft-close features, they use a different box design where the carriages are hidden inside for smoother operation.

A small guide behind the wall keeps the door aligned from the bottom while the rollers support it from above. The setup required precise measurements to ensure the track would be level and the door would slide smoothly without any binding or catching on the wall surface.

Product Specification

Style

Sliding Shower Door

Metal Finish

Polished Chrome

Glass Type

10mm Ultra Clear

Frame Style

Frameless

Special Features

Minimalistic Door Seals, Wide Entry, Sliding Track Modification

Price Range

££

Product Dimensions

Width

900mm

Height

2000mm

Custom sizes available - contact us for bespoke measurements

Shower with Sliding Glass Door Manufacturing Schedule

Frameless sliding systems require precision engineering for smooth operation. Your Shower with Sliding Glass Door production includes specialized track mechanisms and glass preparation.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 1 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.

13
Working Days Total
8
Production Days
1
Days On-Site

Tiling Not Ready

Extended Timeline

Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 1 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.

15
Working Days Minimum
11
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Plan Your Sliding Door

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+