Frameless Shower Screens with Corner Entry London

This London bathroom features two frameless shower screens creating a corner entry next to a bathtub. By client request, we installed full-height clear glass panels with black U-channel fixings that complement the striking marble-style wall tiles.

Full-height frameless shower screens with corner entry and black U-channel fittings

Full-Height Shower Screens

These shower screens reach the full room height of 2700mm, creating a clean line from floor to ceiling. The sleek design emphasizes the beautiful marble-style tiles and creates visual continuity in the bathroom.

As requested in the design brief, we installed two screens - one at floor level forming a 1200mm x 900mm shower area, and another panel mounted on the bath edge. We provide glass panel solutions according to client specifications.

Black-framed frameless shower screens installed at bath level and floor level with black marble tiles

Corner Entry Configuration

The corner entry layout was executed according to the client's design specifications. The black U-channels secure the glass panels to the walls and ceiling, matching the black floor tiles for a cohesive look.

Both made-to-measure shower panels were fixed with black U-channels to create the frameless appearance while ensuring proper support for the 10mm clear glass panels.

Two frameless shower screens creating a corner shower entry next to white bathtub

Design Considerations for Shower Screens

Unfortunately, this is one of the cases where size matters. Shower screens should be wide enough to protect the bathroom floor from water splashes. The ideal width depends on shower head position and water pressure.

For most installations, we recommend screen widths of at least 900mm. Smaller screens may not provide enough splash protection, in which case adding a door becomes necessary for proper water containment.

Product Specification

Style

Walk-in Shower Screen

Metal Finish

Black

Glass Type

10mm Clear

Frame Style

Frameless

Special Features

Full Height

Price Range

££

Product Dimensions

Width

1200mm

Depth

900mm

Height

2700mm

Custom sizes available - contact us for bespoke measurements

How Long Does Shower Screens Corner Entry Take to Manufacture?

Walk-in frameless designs create seamless shower entries with minimal visual interruption. The Shower Screens Corner Entry timeline prioritizes structural integrity and clean lines.

📋 Multiple Items: Each additional shower enclosure may extend Design and Installation by approximately 1 working day. However, orders of 5+ units benefit from streamlined production processes that reduce per-unit time. We'll provide an optimized timeline for your specific project.

Tiling Ready

Simplest Process

Your walls are tiled and ready for frameless installation. We'll take precise measurements for minimal hardware placement, then proceed directly with glass production.

Site Survey 1 day
Precise measurements and photos
Design & 3D 3 days
Create and approve your frameless design
Glass Production 8 days
Cutting, tempering, and processing
Installation 1 days
Professional fitting with minimal hardware

✓ Streamlined Process: Frameless options require less time than framed equivalents - just 13 working days total with precise measurements taken in one visit.

13
Working Days Total
8
Production Days
1
Days On-Site

Tiling Not Ready

Extended Timeline

Your walls need tiling before frameless installation. We'll take initial measurements for visualization, then return for final measurements and proceed with glass production.

Initial Visit 1 day
Rough measurements and photos
Design & 3D 3 days
Create initial frameless design
Waiting for Tiling Variable
Depends on your tiling schedule
Final Measurements 1 day
Precise measurements once tiling is complete
Design Adjustments 1 day
Update design if dimensions changed
Glass Production 8 days
Cut to exact measurements
Installation 1 days
Professional fitting with minimal hardware

💡 Flexible Timeline: The waiting period begins after design confirmation (day 4) and varies based on your tiling schedule. If your tiling is completed during this early period, we can arrange the final measurements earlier and advance the entire schedule - moving final measurements, design adjustments, glass production, and installation to start as early as day 5. The total timeline shows the minimum 15 working days if tiling is ready when design is confirmed.

15
Working Days Minimum
11
Production Days
1
Days On-Site

Interested in a Similar Design?

Let our experts create a bespoke shower solution perfectly tailored to your space. From survey to installation, we handle everything with precision and care.

Design Your Corner Shower Screen

Understanding Our Pricing

Each symbol reflects a full-service estimate, including survey, design, production, and installation. We only offer complete packages — no supply-only options.

Prices are adjusted based on real projects and assume the installation is within one hour's travel from one of our offices. Travel beyond this range may increase the price.

VAT is not included and will be added where required. Displayed prices are for guidance only and reflect localised, complete installations.

Price Range Guide

  • £ Up to £1,500
  • ££ £1,501 - £2,500
  • £££ £2,501 - £3,200
  • ££££ £3,201 - £8,000
  • £££££ £8,001+